Projects

Work we are proud to put our name on

A selection of completed installations, upgrades and rescue jobs across Lagos.

Jobison Solar Energy installation: 5kVA SRNE hybrid + lithium powerwall — Magodo, Lagos

5kVA SRNE hybrid + lithium powerwall — Magodo, Lagos

Wall-mounted SRNE hybrid inverter paired with a lithium powerwall, feeding lights, fans, fridge, TV and a home office through a clean change-over.

Before

Generator running 6–8 hours daily

After

Generator on standby only

Jobison Solar Energy installation: Three-inverter commercial wall — Ikeja

Three-inverter commercial wall — Ikeja

Three SRNE inverters installed in parallel with shared DC protection, sized from a two-week energy audit of the client's production equipment.

Before

₦1.8m monthly diesel spend

After

Diesel reduced by over 60%

Jobison Solar Energy installation: Inverter & battery room rebuild — Ogba

Inverter & battery room rebuild — Ogba

Rewired an unsafe installation: correct breakers, surge protection, earthing and labelled cable management.

Before

Overheating cables, frequent trips

After

Stable, inspection-ready installation

Jobison Solar Energy installation: Battery rack & change-over build — Ikeja

Battery rack & change-over build — Ikeja

Fabricated a steel battery rack, terminated the bank with proper lugs and mounted the change-over enclosure above it for safe servicing.

Before

Batteries sitting on bare floor

After

Ventilated, serviceable battery station

Jobison Solar Energy installation: Inverter capacity upgrade — Agege

Inverter capacity upgrade — Agege

Replaced two ageing units with a higher-capacity inverter on a reinforced Genus battery stand, keeping existing cabling where it tested sound.

Before

Backup lasting under 2 hours

After

Full-night backup on essentials

Jobison Solar Energy installation: Battery bank replacement — Lagos Mainland

Battery bank replacement — Lagos Mainland

Our technician terminating a fresh tubular bank after load testing the old cells and correcting the series/parallel arrangement.

Before

Weak, mismatched cells

After

Balanced bank with tested capacity